[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"fda-warning-letters-search:[\"Bausch & Lomb Surgical, Inc.\",\"\",\"\",\"\",\"\",1]":3,"fda-latest-sync-dates":55},{"warningLetters":4,"total":54},[5,32],{"id":6,"raw":7,"subject":12,"body_html":14,"body_text":15,"firm_name":16,"letter_id":17,"created_at":18,"fei_number":19,"letter_url":20,"updated_at":21,"action_type":22,"case_status":23,"posted_date":24,"marcs_cms_no":25,"product_type":26,"closeout_date":19,"issuing_office":11,"recipient_name":27,"body_fetched_at":28,"delivery_method":29,"recipient_title":19,"reference_number":30,"action_taken_date":31,"medical_device_id":19,"response_letter_date":19},21738,[8,9,10,11,12,13,13,13],"\u003Ctime datetime=\"2026-09-15T04:00:00Z\">09\u002F15\u002F2026\u003C\u002Ftime>\n","\u003Ctime datetime=\"2026-09-04T04:00:00Z\">09\u002F04\u002F2026\u003C\u002Ftime>\n","\u003Ca href=\"\u002Finspections-compliance-enforcement-and-criminal-investigations\u002Fwarning-letters\u002Fbausch-lomb-inc-732398-09042026\">Bausch &amp; Lomb Inc. \u003C\u002Fa>","Center for Drug Evaluation and Research (CDER)","CGMP\u002FFinished Pharmaceuticals\u002FAdulterated","","\n\n                            \n                            \n                            \n                            \n                                              \n  \n \n\n                 \n\n  \u003Chr>\n \n\n\u003Cdiv>\n  \u003Cdl>\n\n              \u003Cdt>Delivery Method:\u003C\u002Fdt> \n        \u003Cdd>VIA UNITED PARCEL SERVICE\n                                                                                                                                                                                                                                                                                                                                                                                                                              \u003C\u002Fdd>\n      \n              \u003Cdt>Reference #:\u003C\u002Fdt> \n        \u003Cdd>320-26-123\u003C\u002Fdd>\n      \n              \u003Cdt>Product:\u003C\u002Fdt> \n        \u003Cdd>Drugs                          \n            \n            \n            \n            \n                          \u003Cbr>Over-the-Counter Drugs\n                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          \n            \n            \n             \n            \n            \n            \n              \n            \n            \n            \u003C\u002Fdd>\n      \n          \u003C\u002Fdl>\n  \u003C\u002Fdiv>            \n\n\n\u003Chr>\n\n\u003Cdiv>\n  \u003Cdiv>\n    \u003Cdl>\n\n        \u003Cdt>Recipient:\u003C\u002Fdt>\n\n                      \u003Cdd>\n  \u003Cdiv>\n    \u003Cdiv>Recipient Name\u003C\u002Fdiv>\n              \u003Cdiv>Mr. Robert T. Fulop\u003C\u002Fdiv>\n          \u003C\u002Fdiv>\n\u003C\u002Fdd>\n                                \u003Cdd>\n  \u003Cdiv>\n    \u003Cdiv>Recipient Title\u003C\u002Fdiv>\n              \u003Cdiv>Director of Site Operations \u003C\u002Fdiv>\n          \u003C\u002Fdiv>\n\u003C\u002Fdd>\n          \n            \u003Cdd>Bausch &amp; Lomb Inc. \u003C\u002Fdd>\n\n          \n                      \u003Cdd>\u003Cp>\u003Cspan>8500 Hidden River Parkway\u003C\u002Fspan>\u003Cbr>\n\u003Cspan>Tampa\u003C\u002Fspan>, \u003Cspan>FL\u003C\u002Fspan> \u003Cspan>33637-1014\u003C\u002Fspan>\u003Cbr>\n\u003Cspan>United States\u003C\u002Fspan>\u003C\u002Fp>\u003C\u002Fdd>\n          \n          \n            \n            \u003Cdd>\n\n    \u003C\u002Fdd>\u003Cdd>\u003Cspan>\u003C\u002Fspan>\u003Ca href=\"mailto:(b)(4)\"> (b)(4)\u003C\u002Fa>\u003C\u002Fdd>\n\n          \n    \u003C\u002Fdl>\n  \u003C\u002Fdiv>            \n\n       \u003Cdiv>\n    \u003Cdl>\n          \n          \u003Cdt>Issuing Office:\u003C\u002Fdt>\n        \n         \n          \u003Cdd>Center for Drug Evaluation and Research (CDER)\u003C\u002Fdd>\n        \n         \n          \u003Cdd>\u003Cp>\u003Cspan>United States\u003C\u002Fspan>\u003C\u002Fp>\u003C\u002Fdd>\n        \n        \n        \n        \n        \n    \u003C\u002Fdl>\n    \u003Cdl> \n      \n    \u003C\u002Fdl>\n  \u003C\u002Fdiv>  \n      \n\u003C\u002Fdiv>\n\n \n\n \n\n\u003Chr>\n\n\u003Cp>September 4, 2026\u003C\u002Fp>\u003Cp>\u003Cstrong>WARNING LETTER\u003C\u002Fstrong>\u003Cbr>Reference number: 320-26-123\u003C\u002Fp>\u003Cp>To Mr. Robert T. Fulop:\u003C\u002Fp>\u003Cp>This warning letter advises you of significant violations observed during a U.S. Food and Drug Administration (FDA) inspection of your facility. Promptly address the violations described herein without delay, including ensuring that appropriate resources are allocated to fully address the violations and prevent their recurrence. This is not intended to be an all-inclusive list of the violations that exist at your facility. It is your responsibility to ensure that your firm complies with all requirements of federal law, including FDA regulations. Failure to adequately address violations may result in regulatory or legal action without further notice including, without limitation, seizure and injunction.\u003C\u002Fp>\u003Cp>\u003Cstrong>FDA Inspection\u003C\u002Fstrong>\u003C\u002Fp>\u003Cp>Violations were observed and documented during an inspection of your drug manufacturing facility, Bausch &amp; Lomb Inc., FDA Establishment Identifier (FEI) 1000113778, at 8500 Hidden River Parkway, Tampa, from March 12 to 20, 2026. This inspection was conducted under FDA’s statutory authority and public health responsibilities to protect the public from unsafe, ineffective, and poor quality drugs.\u003C\u002Fp>\u003Cp>This warning letter summarizes significant violations of Current Good Manufacturing Practice (CGMP) regulations for finished pharmaceuticals. See Title 21 Code of Federal Regulations (CFR), parts 210 and 211 (21 CFR parts 210 and 211).\u003C\u002Fp>\u003Cp>Because your methods, facilities, or controls for manufacturing, processing, packing, or holding do not conform to CGMP, your drug products are adulterated within the meaning of section 501(a)(2)(B) of the Federal Food, Drug, and Cosmetic Act (FD&amp;C Act), 21 U.S.C. 351(a)(2)(B).\u003C\u002Fp>\u003Cp>We reviewed your April 10, 2026, response to our Form FDA 483 in detail and acknowledge receipt of your subsequent correspondence.\u003C\u002Fp>\u003Cp>\u003Cstrong>Violations of the Federal Food, Drug, and Cosmetic Act\u003C\u002Fstrong>\u003C\u002Fp>\u003Cp>The following are violations identified during our inspection and review. As a reminder, this is not an all-inclusive list of violations at your facility.\u003C\u002Fp>\u003Cp>\u003Cstrong>1. Your firm failed to perform operations within specifically defined areas of adequate size and to have separate or defined areas or such other control systems necessary to prevent contamination or mix-ups in aseptic processing areas (21 CFR 211.42(c)(10)).\u003C\u002Fstrong>\u003C\u002Fp>\u003Cp>\u003Cem>Inadequate Monitoring of Aseptic Processing\u003C\u002Fem>\u003C\u002Fp>\u003Cp>Your firm is a manufacturer of sterile prescription and over-the-counter (OTC) \u003Cstrong>(b)(4)\u003C\u002Fstrong> drug products produced by aseptic processing. Your environmental monitoring (EM) program and personnel monitoring (PM) was inadequate for classified areas used to produce your sterile \u003Cstrong>(b)(4)\u003C\u002Fstrong> drug products. For example,\u003C\u002Fp>\u003Cul>\u003Cli>Your program did not sufficiently monitor significant locations (e.g., phones used in the aseptic processing area).\u003C\u002Fli>\u003Cli>EM procedures used to evaluate the aseptic processing environment were insufficient.\u003C\u002Fli>\u003Cli>Media used to support your EM program was observed to be inadequate to support growth of recovered contamination (e.g., cracked media).\u003C\u002Fli>\u003C\u002Ful>\u003Cp>From 2023 to 2025 you routinely recovered microorganisms from aseptic ISO 5 areas (air, surface, and personnel) that were out-of-limit (OOL). Notably, recovered microbes in the aseptic processing environment included gram-negative rods such as \u003Cem>Serratia marcescens\u003C\u002Fem> and \u003Cem>Stenotrophomonas maltophilia\u003C\u002Fem>, organisms frequently associated with water sources, suggesting a moisture-related contamination issue. You continued \u003Cstrong>(b)(4)\u003C\u002Fstrong> drug production without adequate corrective action and preventive action (CAPA) measures to address the persistent microbiological contamination in your ISO 5 environments that posed a risk to product sterility.\u003C\u002Fp>\u003Cp>\u003Cem>Manufacturing Design and Unidirectional Airflow\u003C\u002Fem>\u003C\u002Fp>\u003Cp>Your restricted access barrier system (RABS) line \u003Cstrong>(b)(4)\u003C\u002Fstrong> included design deficiencies, including \u003Cstrong>(b)(4)\u003C\u002Fstrong> placement that led to ergonomic difficulties (e.g., when \u003Cstrong>(b)(4)\u003C\u002Fstrong> transferring sterilized components \u003Cstrong>(b)(4)\u003C\u002Fstrong>). We also noted that line \u003Cstrong>(b)(4)\u003C\u002Fstrong> had insufficient barrier protection. In addition, your dynamic smoke studies failed to sufficiently demonstrate unidirectional airflow protection across multiple lines (e.g., during equipment setup and assembly in the filling areas).\u003C\u002Fp>\u003Cp>Basic design deficiencies and excessive recoveries of microorganisms from ISO 5 areas indicate that there is significant inherent contamination risk in your current operation.\u003C\u002Fp>\u003Cp>Your response indicates that your aseptic processing operation is in control based on EM data, sterility test results, and foreign matter complaint rates. Your response also states that you have implemented procedural changes for \u003Cstrong>(b)(4)\u003C\u002Fstrong> loading and added mandatory disinfection requirements following recovery of fungi or gram-negative rods from ISO 5 and ISO 7 areas.\u003C\u002Fp>\u003Cp>Overall, your response fails to address how you will ensure adequate aseptic processing operations, proper future assessment of your EM and PM data to support your aseptic processes, and appropriate interpretation and assessment of consumer complaint samples. You also lack a commitment to implement significant design remediations.\u003C\u002Fp>\u003Cp>It should be noted that a sterility test, while a critical quality control for drug products that purport to be sterile, cannot be solely relied upon as justification to release drug product batches. The test is only the last in a series of design provisions and controls intended to protect the consumer from distribution of an unsafe batch.\u003C\u002Fp>\u003Cp>The ISO 5 processing environments are critical because sterile products are exposed during aseptic production and therefore vulnerable to contamination if operations are not well designed and diligently controlled. Your aseptic processes should be designed, and operations executed, to prevent contamination hazards to your sterile product. Flaws in the design of cleanrooms and aseptic processing lines, or improper execution of operations, can promote influx of contamination into the critical processing area.\u003C\u002Fp>\u003Cp>You also failed to adequately investigate microbiological departures from action limits and adverse trends in your water for injection system and environmental and personnel monitoring programs. Your investigations did not evaluate the persistent recovery of microorganisms over time, and you did not perform adequate microorganism identification. Notably, microorganisms recovered from your facility, including \u003Cem>Pseudomonas aeruginosa\u003C\u002Fem> and \u003Cem>Aspergillus brasiliensis\u003C\u002Fem>, were the same genus and species as those recovered from several consumer complaint samples.\u003C\u002Fp>\u003Cp>In response to this letter, provide:\u003C\u002Fp>\u003Cul>\u003Cli>An independent, comprehensive review of your EM program to ensure vigilant, timely detection and response to potential product contamination hazards in your manufacturing environment. This assessment should include, but not be limited to, the following:\u003Cbr>o Establishing appropriate limits\u003Cbr>o Sampling methods\u003Cbr>o Sampling locations and frequencies\u003Cbr>o Trend analysis\u003Cbr>o Appropriate investigation of deviations and adverse trends\u003Cbr>o A CAPA plan based on the findings of the assessment\u003C\u002Fli>\u003Cli>A comprehensive, independent assessment of the design and control of your firm’s manufacturing operations, with a detailed and thorough review of all microbiological hazards.\u003C\u002Fli>\u003Cli>A detailed risk assessment addressing the hazards posed by distributing drug products with potentially objectionable contamination. Specify actions you will take in response to the risk assessment, such as customer notifications and product recalls.\u003C\u002Fli>\u003Cli>Complete investigations into all batches with potential objectionable microbiological contamination or an OOL microbiological result (whether or not later invalidated). The investigations should detail your findings regarding the root causes of the contamination.\u003C\u002Fli>\u003Cli>Appropriate microbiological batch release specifications (i.e., total counts, identification of bioburden to detect objectionable microbes) for each of your drug products.\u003C\u002Fli>\u003Cli>All microbiological test methods used to analyze each of your drug products.\u003C\u002Fli>\u003Cli>A summary of results from testing retain samples of all drug product batches within expiry. You should test all appropriate quality attributes including, but not limited to, identity and strength of active ingredients and microbiological quality (total counts and identification of bioburden to detect any objectionable microbes) of each batch. If testing yields an OOL result, indicate the corrective actions you will take, including notifying customers and initiating recalls.\u003C\u002Fli>\u003Cli>Perform a critical evaluation of airflow unidirectionality in your aseptic process, with the assistance of a qualified consultant. Ensure smoke studies are conducted under dynamic conditions, with thorough and complete evaluations of aseptic processing line airflow unidirectionality, including the impact of dynamic interactions and aseptic interventions. These thorough smoke studies should be performed after you remediate your aseptic operation and conducted using proper practices (e.g., neutrally buoyant media) to appropriately visualize airflow.\u003C\u002Fli>\u003C\u002Ful>\u003Cp>\u003Cstrong>2. Your firm failed to establish and follow appropriate written procedures that are designed to prevent microbiological contamination of drug products purporting to be sterile, and that include validation of all aseptic and sterilization processes (21 CFR 211.113(b)).\u003C\u002Fstrong>\u003C\u002Fp>\u003Cp>\u003Cem>Poor Aseptic Technique and Cleanroom Behavior\u003C\u002Fem>\u003C\u002Fp>\u003Cp>Your operators were observed repeatedly exhibiting poor aseptic practices during filling operations on \u003Cstrong>(b)(4)\u003C\u002Fstrong> line \u003Cstrong>(b)(4)\u003C\u002Fstrong>, including, but not limited to, the following:\u003C\u002Fp>\u003Cul>\u003Cli>Operators reached over exposed \u003Cstrong>(b)(4)\u003C\u002Fstrong> bottles while \u003Cstrong>(b)(4)\u003C\u002Fstrong> to remove jammed bottles.\u003C\u002Fli>\u003Cli>Operators failed to disinfect \u003Cstrong>(b)(4)\u003C\u002Fstrong> (e.g., prior to handling sterile supplies and between use of different \u003Cstrong>(b)(4)\u003C\u002Fstrong>).\u003C\u002Fli>\u003Cli>\u003Cstrong>(b)(4)\u003C\u002Fstrong> contacted \u003Cstrong>(b)(4)\u003C\u002Fstrong> housing and blocked unidirectional air to open sterilized bottles.\u003C\u002Fli>\u003Cli>\u003Cstrong>(b)(4)\u003C\u002Fstrong> contacted sterile portions of aseptic tweezers used to remove jammed bottles, and operators returned those bottles back to the \u003Cstrong>(b)(4)\u003C\u002Fstrong>.\u003C\u002Fli>\u003Cli>Bags used to transfer sterile components (bottles) were exposed to the ISO 7 environment prior to manipulation with \u003Cstrong>(b)(4)\u003C\u002Fstrong> and contacted internal portions of the \u003Cstrong>(b)(4)\u003C\u002Fstrong> housing.\u003C\u002Fli>\u003Cli>Operators used \u003Cstrong>(b)(4)\u003C\u002Fstrong> to push trash into a receptacle located below the processing line rather than using equipment dedicated for this purpose.\u003C\u002Fli>\u003C\u002Ful>\u003Cp>In your response, you commit to updating your personnel training and using \u003Cstrong>(b)(4)\u003C\u002Fstrong> aseptic training \u003Cstrong>(b)(4)\u003C\u002Fstrong>. Your response does not address the failure of the operations and quality unit to detect and require remediation of these significant aseptic processing hazards. Your response also fails to address how your operations and quality unit will proactively oversee and maintain ongoing control over aseptic conditions, processes, and finished product.\u003C\u002Fp>\u003Cp>Other aseptic line deficiencies were also observed during our inspection. For example, line \u003Cstrong>(b)(4)\u003C\u002Fstrong> included aseptic setup hazards related to personnel and line design that could compromise the sterility of product contact equipment.\u003C\u002Fp>\u003Cp>In addition, your process simulations (media fill) were inadequate. Data indicated that the total number of units in your media fills were substantially smaller than your aseptically produced commercial batch sizes and did not sufficiently represent the contamination risks associated with your aseptic processing lines. Significantly, you documented a media fill failure on line 16 in July 2025, in which two units demonstrated fungal (\u003Cem>Neovaginatispora magiferae\u003C\u002Fem>) and spore forming gram-positive \u003Cem>Geodermatophilus obscurus\u003C\u002Fem>, contamination, respectively.\u003C\u002Fp>\u003Cp>See FDA’s guidance document \u003Cem>Sterile Drug Products Produced by Aseptic Processing - Current Good Manufacturing Practice\u003C\u002Fem> to help you meet the CGMP requirements when manufacturing sterile drugs using aseptic processing at https:\u002F\u002Fwww.fda.gov\u002Fmedia\u002F71026\u002Fdownload.\u003C\u002Fp>\u003Cp>In response to this letter, provide:\u003C\u002Fp>\u003Cul>\u003Cli>A comprehensive, independent risk assessment of all contamination hazards with respect to your aseptic processes, equipment, and facilities, including but not limited to, the following:\u003Cbr>o All human interactions within the ISO 5 area (e.g., risk reduction or elimination of manual interventions wherever possible)\u003Cbr>o Equipment suitability (e.g., reliability, capability, ergonomics, placement) and sufficient cleanroom space\u003Cbr>o Air quality in the ISO 5 area and surrounding room including, but not limited to, air volume and flow\u003Cbr>o Facility layout\u003Cbr>o Personnel flow and material flow (movement throughout all rooms used to conduct and support sterile operations, and all material transfers)\u003Cbr>o Specific CAPA recommendations that will comprehensively address the design and control hazards identified in the risk assessment\u003C\u002Fli>\u003Cli>A detailed remediation plan with timelines to address the findings of the contamination hazards risk assessment. Describe specific tangible improvements to be made to aseptic processing operation design and control at your facility and explain how this CAPA plan will robustly remediate your deficient sterile manufacturing operations. Include comprehensive changes to the design of \u003Cstrong>(b)(4)\u003C\u002Fstrong> aseptic processing lines and cleanrooms. Also, describe your plans for qualification and validation of your extensively remediated operations.\u003C\u002Fli>\u003Cli>Your systematic plan to assure adherence to appropriate aseptic practices, cleanroom behavior, and written procedures, including but not limited to an independent assessment of the following with accompanying CAPA:\u003Cbr>o Suitability of actual practices based on extensive retrospective review and prospective observation of aseptic processing operations\u003Cbr>o Deficiencies in production management oversight, and identification of specific improvements to ensure effective and routine supervisory oversight for all batches\u003Cbr>o Frequency and depth of quality unit oversight (e.g., audit, ad hoc, daily interactions) of aseptic processing and its support operations\u003Cbr>o Adequacy of written procedures\u003C\u002Fli>\u003C\u002Ful>\u003Cp>\u003Cstrong>Ineffective Quality System\u003C\u002Fstrong>\u003C\u002Fp>\u003Cp>Significant findings in this letter demonstrate that your firm does not operate an effective quality system in accord with CGMP. In addition to the lack of effective management oversight of your production operations, we found your quality unit is not enabled to exercise proper authority and\u002For has insufficiently implemented its responsibilities. Executive management should immediately and comprehensively assess your company’s global manufacturing operations to ensure that your systems, processes, and products conform to FDA requirements.\u003C\u002Fp>\u003Cp>\u003Cstrong>Request for a Meeting with FDA\u003C\u002Fstrong>\u003C\u002Fp>\u003Cp>After you submit your response to this warning letter, we recommend you reach out to this office to arrange for a teleconference to discuss your corrective actions and preventive actions in detail. Direct your request to Kathryn Hall Kathryn.Hall@fda.hhs.gov and cc: CDER-OC-OMQ-Communications@fda.hhs.gov.\u003C\u002Fp>\u003Cp>\u003Cstrong>Conclusion\u003C\u002Fstrong>\u003C\u002Fp>\u003Cp>You are responsible for investigating and determining the root causes of any violations and implementing corrective and preventative measures to ensure future and sustained compliance so that these violations and any others do not occur.\u003C\u002Fp>\u003Cp>Unresolved violations may prevent other Federal agencies from awarding contracts. Failure to address violations may also cause FDA to withhold issuance of Export Certificates. FDA may withhold approval of new applications or supplements listing your firm as a drug manufacturer until any violations are completely addressed and we confirm your compliance with CGMP. We may re-inspect to verify that you have completed corrective actions to address any violations.\u003C\u002Fp>\u003Cp>If you are considering an action that is likely to lead to a disruption in the supply of drugs produced at your facility, FDA requests that you contact CDER’s Drug Shortages Staff immediately, at drugshortages@fda.hhs.gov, so that FDA can work with you on the most effective way to bring your operations into compliance with the law. Contacting the Drug Shortages Staff also allows you to meet any obligations you may have to report discontinuances or interruptions in your drug manufacture under 21 U.S.C. 356c(b). This also allows FDA to consider, as soon as possible, what actions, if any, may be needed to avoid shortages and protect the health of patients who depend on your products.\u003C\u002Fp>\u003Cp>Send your written response to CDER-OC-OMQ-Communications@fda.hhs.gov within fifteen (15) business days of receipt of this letter1. Identify your written response with FEI 1000113778 and ATTN: Compliance Officer Matthew R. Dionne, in the letter or \u002Fin the subject line of the email.\u003C\u002Fp>\u003Cp>If you have information that you believe demonstrates that your products are not in violation of the FD&amp;C Act and FDA regulations, include that information for our consideration.\u003C\u002Fp>\u003Cp>FDA posts warning letters to www.FDA.gov.\u003C\u002Fp>\u003Cp>Sincerely,\u003Cbr>\u002FS\u002F\u003C\u002Fp>\u003Cp>Francis Godwin\u003Cbr>Director\u003Cbr>Office of Manufacturing Quality\u003Cbr>Office of Compliance\u003Cbr>Center for Drug Evaluation and Research\u003Cbr>U.S. Food and Drug Administration\u003C\u002Fp>\u003Cp>__________________________\u003Cbr>\u003Cem>\u003Cstrong>1\u003C\u002Fstrong>\u003C\u002Fem> Under program enhancements for the Generic Drug User Fee Amendments (GDUFA) reauthorization for fiscal years (FYs) 2023-2027, also known as the GDUFA III Commitment Letter, your facility may be eligible for a Post-Warning Letter Meeting to obtain preliminary feedback from FDA on the adequacy and completeness of your corrective action plans.\u003C\u002Fp>\n\n\n\n\n\n\n              \n                                            \n              \n            ","Delivery Method:\n\nVIA UNITED PARCEL SERVICE\n\nReference #:\n\n320-26-123\n\nProduct:\n\nDrugs\n\nOver-the-Counter Drugs\n\nRecipient:\n\nRecipient Name\n\nMr. Robert T. Fulop\n\nRecipient Title\n\nDirector of Site Operations\n\nBausch & Lomb Inc.\n\n8500 Hidden River Parkway\n\nTampa, FL 33637-1014\n\nUnited States\n\n(b)(4)\n\nIssuing Office:\n\nCenter for Drug Evaluation and Research (CDER)\n\nUnited States\n\nSeptember 4, 2026\nWARNING LETTER\nReference number: 320-26-123\nTo Mr. Robert T. Fulop:\nThis warning letter advises you of significant violations observed during a U.S. Food and Drug Administration (FDA) inspection of your facility. Promptly address the violations described herein without delay, including ensuring that appropriate resources are allocated to fully address the violations and prevent their recurrence. This is not intended to be an all-inclusive list of the violations that exist at your facility. It is your responsibility to ensure that your firm complies with all requirements of federal law, including FDA regulations. Failure to adequately address violations may result in regulatory or legal action without further notice including, without limitation, seizure and injunction.\nFDA Inspection\nViolations were observed and documented during an inspection of your drug manufacturing facility, Bausch & Lomb Inc., FDA Establishment Identifier (FEI) 1000113778, at 8500 Hidden River Parkway, Tampa, from March 12 to 20, 2026. This inspection was conducted under FDA’s statutory authority and public health responsibilities to protect the public from unsafe, ineffective, and poor quality drugs.\nThis warning letter summarizes significant violations of Current Good Manufacturing Practice (CGMP) regulations for finished pharmaceuticals. See Title 21 Code of Federal Regulations (CFR), parts 210 and 211 (21 CFR parts 210 and 211).\nBecause your methods, facilities, or controls for manufacturing, processing, packing, or holding do not conform to CGMP, your drug products are adulterated within the meaning of section 501(a)(2)(B) of the Federal Food, Drug, and Cosmetic Act (FD&C Act), 21 U.S.C. 351(a)(2)(B).\nWe reviewed your April 10, 2026, response to our Form FDA 483 in detail and acknowledge receipt of your subsequent correspondence.\nViolations of the Federal Food, Drug, and Cosmetic Act\nThe following are violations identified during our inspection and review. As a reminder, this is not an all-inclusive list of violations at your facility.\n1. Your firm failed to perform operations within specifically defined areas of adequate size and to have separate or defined areas or such other control systems necessary to prevent contamination or mix-ups in aseptic processing areas (21 CFR 211.42(c)(10)).\nInadequate Monitoring of Aseptic Processing\nYour firm is a manufacturer of sterile prescription and over-the-counter (OTC) (b)(4) drug products produced by aseptic processing. Your environmental monitoring (EM) program and personnel monitoring (PM) was inadequate for classified areas used to produce your sterile (b)(4) drug products. For example,\nYour program did not sufficiently monitor significant locations (e.g., phones used in the aseptic processing area).\nEM procedures used to evaluate the aseptic processing environment were insufficient.\nMedia used to support your EM program was observed to be inadequate to support growth of recovered contamination (e.g., cracked media).\nFrom 2023 to 2025 you routinely recovered microorganisms from aseptic ISO 5 areas (air, surface, and personnel) that were out-of-limit (OOL). Notably, recovered microbes in the aseptic processing environment included gram-negative rods such as Serratia marcescens and Stenotrophomonas maltophilia, organisms frequently associated with water sources, suggesting a moisture-related contamination issue. You continued (b)(4) drug production without adequate corrective action and preventive action (CAPA) measures to address the persistent microbiological contamination in your ISO 5 environments that posed a risk to product sterility.\nManufacturing Design and Unidirectional Airflow\nYour restricted access barrier system (RABS) line (b)(4) included design deficiencies, including (b)(4) placement that led to ergonomic difficulties (e.g., when (b)(4) transferring sterilized components (b)(4)). We also noted that line (b)(4) had insufficient barrier protection. In addition, your dynamic smoke studies failed to sufficiently demonstrate unidirectional airflow protection across multiple lines (e.g., during equipment setup and assembly in the filling areas).\nBasic design deficiencies and excessive recoveries of microorganisms from ISO 5 areas indicate that there is significant inherent contamination risk in your current operation.\nYour response indicates that your aseptic processing operation is in control based on EM data, sterility test results, and foreign matter complaint rates. Your response also states that you have implemented procedural changes for (b)(4) loading and added mandatory disinfection requirements following recovery of fungi or gram-negative rods from ISO 5 and ISO 7 areas.\nOverall, your response fails to address how you will ensure adequate aseptic processing operations, proper future assessment of your EM and PM data to support your aseptic processes, and appropriate interpretation and assessment of consumer complaint samples. You also lack a commitment to implement significant design remediations.\nIt should be noted that a sterility test, while a critical quality control for drug products that purport to be sterile, cannot be solely relied upon as justification to release drug product batches. The test is only the last in a series of design provisions and controls intended to protect the consumer from distribution of an unsafe batch.\nThe ISO 5 processing environments are critical because sterile products are exposed during aseptic production and therefore vulnerable to contamination if operations are not well designed and diligently controlled. Your aseptic processes should be designed, and operations executed, to prevent contamination hazards to your sterile product. Flaws in the design of cleanrooms and aseptic processing lines, or improper execution of operations, can promote influx of contamination into the critical processing area.\nYou also failed to adequately investigate microbiological departures from action limits and adverse trends in your water for injection system and environmental and personnel monitoring programs. Your investigations did not evaluate the persistent recovery of microorganisms over time, and you did not perform adequate microorganism identification. Notably, microorganisms recovered from your facility, including Pseudomonas aeruginosa and Aspergillus brasiliensis, were the same genus and species as those recovered from several consumer complaint samples.\nIn response to this letter, provide:\nAn independent, comprehensive review of your EM program to ensure vigilant, timely detection and response to potential product contamination hazards in your manufacturing environment. This assessment should include, but not be limited to, the following:\no Establishing appropriate limits\no Sampling methods\no Sampling locations and frequencies\no Trend analysis\no Appropriate investigation of deviations and adverse trends\no A CAPA plan based on the findings of the assessment\nA comprehensive, independent assessment of the design and control of your firm’s manufacturing operations, with a detailed and thorough review of all microbiological hazards.\nA detailed risk assessment addressing the hazards posed by distributing drug products with potentially objectionable contamination. Specify actions you will take in response to the risk assessment, such as customer notifications and product recalls.\nComplete investigations into all batches with potential objectionable microbiological contamination or an OOL microbiological result (whether or not later invalidated). The investigations should detail your findings regarding the root causes of the contamination.\nAppropriate microbiological batch release specifications (i.e., total counts, identification of bioburden to detect objectionable microbes) for each of your drug products.\nAll microbiological test methods used to analyze each of your drug products.\nA summary of results from testing retain samples of all drug product batches within expiry. You should test all appropriate quality attributes including, but not limited to, identity and strength of active ingredients and microbiological quality (total counts and identification of bioburden to detect any objectionable microbes) of each batch. If testing yields an OOL result, indicate the corrective actions you will take, including notifying customers and initiating recalls.\nPerform a critical evaluation of airflow unidirectionality in your aseptic process, with the assistance of a qualified consultant. Ensure smoke studies are conducted under dynamic conditions, with thorough and complete evaluations of aseptic processing line airflow unidirectionality, including the impact of dynamic interactions and aseptic interventions. These thorough smoke studies should be performed after you remediate your aseptic operation and conducted using proper practices (e.g., neutrally buoyant media) to appropriately visualize airflow.\n2. Your firm failed to establish and follow appropriate written procedures that are designed to prevent microbiological contamination of drug products purporting to be sterile, and that include validation of all aseptic and sterilization processes (21 CFR 211.113(b)).\nPoor Aseptic Technique and Cleanroom Behavior\nYour operators were observed repeatedly exhibiting poor aseptic practices during filling operations on (b)(4) line (b)(4), including, but not limited to, the following:\nOperators reached over exposed (b)(4) bottles while (b)(4) to remove jammed bottles.\nOperators failed to disinfect (b)(4) (e.g., prior to handling sterile supplies and between use of different (b)(4)).\n(b)(4) contacted (b)(4) housing and blocked unidirectional air to open sterilized bottles.\n(b)(4) contacted sterile portions of aseptic tweezers used to remove jammed bottles, and operators returned those bottles back to the (b)(4).\nBags used to transfer sterile components (bottles) were exposed to the ISO 7 environment prior to manipulation with (b)(4) and contacted internal portions of the (b)(4) housing.\nOperators used (b)(4) to push trash into a receptacle located below the processing line rather than using equipment dedicated for this purpose.\nIn your response, you commit to updating your personnel training and using (b)(4) aseptic training (b)(4). Your response does not address the failure of the operations and quality unit to detect and require remediation of these significant aseptic processing hazards. Your response also fails to address how your operations and quality unit will proactively oversee and maintain ongoing control over aseptic conditions, processes, and finished product.\nOther aseptic line deficiencies were also observed during our inspection. For example, line (b)(4) included aseptic setup hazards related to personnel and line design that could compromise the sterility of product contact equipment.\nIn addition, your process simulations (media fill) were inadequate. Data indicated that the total number of units in your media fills were substantially smaller than your aseptically produced commercial batch sizes and did not sufficiently represent the contamination risks associated with your aseptic processing lines. Significantly, you documented a media fill failure on line 16 in July 2025, in which two units demonstrated fungal (Neovaginatispora magiferae) and spore forming gram-positive Geodermatophilus obscurus, contamination, respectively.\nSee FDA’s guidance document Sterile Drug Products Produced by Aseptic Processing - Current Good Manufacturing Practice to help you meet the CGMP requirements when manufacturing sterile drugs using aseptic processing at https:\u002F\u002Fwww.fda.gov\u002Fmedia\u002F71026\u002Fdownload.\nIn response to this letter, provide:\nA comprehensive, independent risk assessment of all contamination hazards with respect to your aseptic processes, equipment, and facilities, including but not limited to, the following:\no All human interactions within the ISO 5 area (e.g., risk reduction or elimination of manual interventions wherever possible)\no Equipment suitability (e.g., reliability, capability, ergonomics, placement) and sufficient cleanroom space\no Air quality in the ISO 5 area and surrounding room including, but not limited to, air volume and flow\no Facility layout\no Personnel flow and material flow (movement throughout all rooms used to conduct and support sterile operations, and all material transfers)\no Specific CAPA recommendations that will comprehensively address the design and control hazards identified in the risk assessment\nA detailed remediation plan with timelines to address the findings of the contamination hazards risk assessment. Describe specific tangible improvements to be made to aseptic processing operation design and control at your facility and explain how this CAPA plan will robustly remediate your deficient sterile manufacturing operations. Include comprehensive changes to the design of (b)(4) aseptic processing lines and cleanrooms. Also, describe your plans for qualification and validation of your extensively remediated operations.\nYour systematic plan to assure adherence to appropriate aseptic practices, cleanroom behavior, and written procedures, including but not limited to an independent assessment of the following with accompanying CAPA:\no Suitability of actual practices based on extensive retrospective review and prospective observation of aseptic processing operations\no Deficiencies in production management oversight, and identification of specific improvements to ensure effective and routine supervisory oversight for all batches\no Frequency and depth of quality unit oversight (e.g., audit, ad hoc, daily interactions) of aseptic processing and its support operations\no Adequacy of written procedures\nIneffective Quality System\nSignificant findings in this letter demonstrate that your firm does not operate an effective quality system in accord with CGMP. In addition to the lack of effective management oversight of your production operations, we found your quality unit is not enabled to exercise proper authority and\u002For has insufficiently implemented its responsibilities. Executive management should immediately and comprehensively assess your company’s global manufacturing operations to ensure that your systems, processes, and products conform to FDA requirements.\nRequest for a Meeting with FDA\nAfter you submit your response to this warning letter, we recommend you reach out to this office to arrange for a teleconference to discuss your corrective actions and preventive actions in detail. Direct your request to Kathryn Hall Kathryn.Hall@fda.hhs.gov and cc: CDER-OC-OMQ-Communications@fda.hhs.gov.\nConclusion\nYou are responsible for investigating and determining the root causes of any violations and implementing corrective and preventative measures to ensure future and sustained compliance so that these violations and any others do not occur.\nUnresolved violations may prevent other Federal agencies from awarding contracts. Failure to address violations may also cause FDA to withhold issuance of Export Certificates. FDA may withhold approval of new applications or supplements listing your firm as a drug manufacturer until any violations are completely addressed and we confirm your compliance with CGMP. We may re-inspect to verify that you have completed corrective actions to address any violations.\nIf you are considering an action that is likely to lead to a disruption in the supply of drugs produced at your facility, FDA requests that you contact CDER’s Drug Shortages Staff immediately, at drugshortages@fda.hhs.gov, so that FDA can work with you on the most effective way to bring your operations into compliance with the law. Contacting the Drug Shortages Staff also allows you to meet any obligations you may have to report discontinuances or interruptions in your drug manufacture under 21 U.S.C. 356c(b). This also allows FDA to consider, as soon as possible, what actions, if any, may be needed to avoid shortages and protect the health of patients who depend on your products.\nSend your written response to CDER-OC-OMQ-Communications@fda.hhs.gov within fifteen (15) business days of receipt of this letter1. Identify your written response with FEI 1000113778 and ATTN: Compliance Officer Matthew R. Dionne, in the letter or \u002Fin the subject line of the email.\nIf you have information that you believe demonstrates that your products are not in violation of the FD&C Act and FDA regulations, include that information for our consideration.\nFDA posts warning letters to www.FDA.gov.\nSincerely,\n\u002FS\u002F\nFrancis Godwin\nDirector\nOffice of Manufacturing Quality\nOffice of Compliance\nCenter for Drug Evaluation and Research\nU.S. Food and Drug Administration\n__________________________\n1 Under program enhancements for the Generic Drug User Fee Amendments (GDUFA) reauthorization for fiscal years (FYs) 2023-2027, also known as the GDUFA III Commitment Letter, your facility may be eligible for a Post-Warning Letter Meeting to obtain preliminary feedback from FDA on the adequacy and completeness of your corrective action plans.","Bausch & Lomb Inc.","bausch-lomb-inc-732398-09042026","2026-10-14T12:31:16.41489+00:00",null,"https:\u002F\u002Fwww.fda.gov\u002Finspections-compliance-enforcement-and-criminal-investigations\u002Fwarning-letters\u002Fbausch-lomb-inc-732398-09042026","2026-10-27T01:18:54.544251+00:00","Warning Letter","Issued","2026-09-15","732398","Drugs Over-the-Counter Drugs","Mr. Robert T. Fulop","2026-10-14T12:37:16.164+00:00","VIA UNITED PARCEL SERVICE","320-26-123","2026-09-04",{"id":33,"raw":34,"subject":39,"body_html":40,"body_text":41,"firm_name":42,"letter_id":43,"created_at":44,"fei_number":19,"letter_url":45,"updated_at":46,"action_type":22,"case_status":23,"posted_date":47,"marcs_cms_no":48,"product_type":49,"closeout_date":19,"issuing_office":38,"recipient_name":50,"body_fetched_at":51,"delivery_method":52,"recipient_title":19,"reference_number":19,"action_taken_date":53,"medical_device_id":19,"response_letter_date":19},746,[35,36,37,38,39,13,13,13],"\u003Ctime datetime=\"2025-07-29T04:00:00Z\">07\u002F29\u002F2025\u003C\u002Ftime>\n","\u003Ctime datetime=\"2025-07-21T04:00:00Z\">07\u002F21\u002F2025\u003C\u002Ftime>\n","\u003Ca href=\"\u002Finspections-compliance-enforcement-and-criminal-investigations\u002Fwarning-letters\u002Fonkos-surgical-inc-712573-07212025\">Onkos Surgical, Inc. \u003C\u002Fa>","Center for Devices and Radiological Health","CGMP\u002FQSR\u002FMedical Devices\u002FAdulterated","\n\n                            \n                            \n                            \n                            \n                                              \n  \n \n\n                 \n\n  \u003Chr>\n \n\n\u003Cdiv>\n  \u003Cdl>\n\n              \u003Cdt>Delivery Method:\u003C\u002Fdt> \n        \u003Cdd>VIA Electronic Mail\n                                                                                                                                                                                                                                                                                                                                                                                                                              \u003C\u002Fdd>\n      \n      \n              \u003Cdt>Product:\u003C\u002Fdt> \n        \u003Cdd>Medical Devices                          \n            \n            \n            \n            \n            \n            \n            \n             \n            \n            \n            \n              \n            \n            \n            \u003C\u002Fdd>\n      \n          \u003C\u002Fdl>\n  \u003C\u002Fdiv>            \n\n\n\u003Chr>\n\n\u003Cdiv>\n  \u003Cdiv>\n    \u003Cdl>\n\n        \u003Cdt>Recipient:\u003C\u002Fdt>\n\n                      \u003Cdd>\n  \u003Cdiv>\n    \u003Cdiv>Recipient Name\u003C\u002Fdiv>\n              \u003Cdiv>Patrick J. Treacy\u003C\u002Fdiv>\n          \u003C\u002Fdiv>\n\u003C\u002Fdd>\n                                \u003Cdd>\n  \u003Cdiv>\n    \u003Cdiv>Recipient Title\u003C\u002Fdiv>\n              \u003Cdiv>President and CEO\u003C\u002Fdiv>\n          \u003C\u002Fdiv>\n\u003C\u002Fdd>\n          \n            \u003Cdd>Onkos Surgical, Inc. \u003C\u002Fdd>\n\n          \n                      \u003Cdd>\u003Cp>\u003Cspan>77 E Halsey Rd\u003C\u002Fspan>\u003Cbr>\n\u003Cspan>Parsippany\u003C\u002Fspan>, \u003Cspan>NJ\u003C\u002Fspan> \u003Cspan>07054\u003C\u002Fspan>\u003Cbr>\n\u003Cspan>United States\u003C\u002Fspan>\u003C\u002Fp>\u003C\u002Fdd>\n          \n          \n            \n            \u003Cdd>\n\n    \u003C\u002Fdd>\u003Cdd>\u003Cspan>\u003C\u002Fspan>\u003Ca href=\"mailto:ptreacy@onkossurgical.com\"> ptreacy@onkossurgical.com \u003C\u002Fa>\u003C\u002Fdd>\n\n          \n    \u003C\u002Fdl>\n  \u003C\u002Fdiv>            \n\n       \u003Cdiv>\n    \u003Cdl>\n          \n          \u003Cdt>Issuing Office:\u003C\u002Fdt>\n        \n         \n          \u003Cdd>Center for Devices and Radiological Health\u003C\u002Fdd>\n        \n         \n          \u003Cdd>\u003Cp>\u003Cspan>United States\u003C\u002Fspan>\u003C\u002Fp>\u003C\u002Fdd>\n        \n        \n        \n        \n        \n    \u003C\u002Fdl>\n    \u003Cdl> \n      \n    \u003C\u002Fdl>\n  \u003C\u002Fdiv>  \n      \n\u003C\u002Fdiv>\n\n \n\n \n\n\u003Chr>\n\n\u003Cp>\u003Cstrong>WARNING LETTER\u003C\u002Fstrong>\u003Cbr>CMS # 712573\u003C\u002Fp>\u003Cp>July 21, 2025\u003C\u002Fp>\u003Cp>Dear Mr. Patrick J. Treacy:\u003C\u002Fp>\u003Cp>During an inspection of your firm located in Parsippany, NJ from February 4, 2025 through April 4, 2025, an investigator (or investigators) from the United States Food and Drug Administration (FDA) determined that your firm is a specification developer of the ELEOS Limb Salvage System indicated for use in total hip and knee arthroplasty for reduction or relief of pain and\u002For improved hip function in skeletally mature patients with select conditions. Under section 201(h) of the Federal Food, Drug, and Cosmetic Act (the Act), 21 U.S.C. § 321(h), these products are devices because they are intended for use in the diagnosis of disease or other conditions or in the cure, mitigation, treatment, or prevention of disease, or to affect the structure or any function of the body.\u003C\u002Fp>\u003Cp>\u003Cstrong>\u003Cu>Quality System Regulation Violation(s)\u003C\u002Fu>\u003C\u002Fstrong>\u003Cbr>This inspection revealed that these devices are adulterated within the meaning of section 501(h) of the Act, 21 U.S.C. § 351(h), in that the methods used in, or the facilities or controls used for, their manufacture, packing, storage, or installation are not in conformity with the current good manufacturing practice requirements of the Quality System regulation found at Title 21, \u003Cu>Code of Federal Regulations\u003C\u002Fu> (CFR), Part 820.\u003C\u002Fp>\u003Cp>We received a response from Len Tokish, Vice President of Quality Assurance and Regulatory Affairs dated May 15, 2025, concerning our investigator’s observations noted on the Form FDA 483 (FDA 483), List of Inspectional Observations, that was issued to your firm. We address this response below, in relation to each of the noted violations. These violations include, but are not limited to, the following:\u003C\u002Fp>\u003Cp>\u003Cstrong>1. Failure to establish and maintain procedures to ensure that all purchased or otherwise received product and services conform to specified requirements, including quality requirements, that must be met by suppliers, contractors, and consultants and define the type and extent of control to be exercised over the product, services, suppliers, contractors, and consultants, based on the evaluation results, as required by 21 CFR 820.50.\u003C\u002Fstrong>\u003C\u002Fp>\u003Cp>Specifically, you failed to adequately implement the “Approved Supplier List” section of your “Supplier, Purchasing and Inspection Controls” procedure (SOP-013; Rev. 0-6; Effective: 4\u002F25\u002F16 - 2\u002F3\u002F25) which requires that you “\u003Cem>ensure compliance to ISO 13485\u003C\u002Fem>” for your Tier 1 suppliers as a “method of control” over approved suppliers. For example, you did not ensure compliance to the process validation requirements (clause 7.5.6) of ISO 13485 (Medical Devices – Quality Management Systems – Requirements for regulatory purposes) for the following three (3) Tier 1 suppliers in that you failed to adequately assess and\u002For document an assessment of the acceptability of their cleaning validations meant to demonstrate that in-process or final cleaning of your ELEOS Implant Devices and Instruments consistently meet your specifications for cleanliness:\u003C\u002Fp>\u003Cp>a. \u003Cstrong>(b)(4)\u003C\u002Fstrong> – Tier \u003Cstrong>(b)(4)\u003C\u002Fstrong> Final Cleaner of ELEOS Implant Devices\u003C\u002Fp>\u003Cp>i. You approved the \u003Cstrong>(b)(4)\u003C\u002Fstrong> cleaning validation test report TR-2771D-01 (Rev. 1-2; Approved: 1\u002F24\u002F19 and 9\u002F10\u002F21) from this supplier despite it failing to define the maximum allowable devices per gallon per run, as required by section 9.2 of the corresponding test protocol TP-2771D-01 (Rev. 2; Approved: 9\u002F10\u002F21) which states “***\u003Cem>The main cleaning parameters that can impact the efficacy of the cleaning process include ***Quantity of parts\u003C\u002Fem> (\u003Cstrong>(b)(4)\u003C\u002Fstrong>)***.”\u003C\u002Fp>\u003Cp>Similarly, you approved \u003Cstrong>(b)(4)\u003C\u002Fstrong> cleaning validation test report TR-2771E-01 (Rev. 1; Approved: 3\u002F18\u002F19) from this supplier despite it failing to document the maximum allowable quantity of \u003Cstrong>(b)(4)\u003C\u002Fstrong> and \u003Cstrong>(b)(4)\u003C\u002Fstrong> per run, as required by sections 9.3, 9.4, and 9.5 of the corresponding test protocol TP-2771E-01 (Rev. 1; Approved: 8\u002F28\u002F18) which state “***\u003Cem>To validate the cleaning process, parts shall be cleaned using\u003C\u002Fem> \u003Cstrong>(b)(4)\u003C\u002Fstrong> \u003Cem>over\u003C\u002Fem> \u003Cstrong>(b)(4)\u003C\u002Fstrong> \u003Cem>runs***To create a\u003C\u002Fem> \u003Cstrong>(b)(4)\u003C\u002Fstrong> \u003Cem>batch of product***Clean what is expected to be a\u003C\u002Fem> “\u003Cstrong>(b)(4)\u003C\u002Fstrong>” load in \u003Cstrong>(b)(4)\u003C\u002Fstrong>***\u003Cem>A cleaning process should not alter the appearance of parts or cause damage. If applicable, appropriate fixtures to hold the components during cleaning should be included in the study and used in routine production\u003C\u002Fem>***.”\u003C\u002Fp>\u003Cp>ii. You failed to adequately assess differences in product design and geometrical configurations of candidate devices for the adoption into device families of existing \u003Cstrong>(b)(4)\u003C\u002Fstrong> cleaning validations conducted by this supplier because you did not accurately answer guiding questions contained in your “\u003Cem>Assessment of Product Change or New Product Adoption for Cleaning Processes\u003C\u002Fem>” reports. For example:\u003C\u002Fp>\u003Cp> The AC-2772-01 (Rev. 01; Effective: 7\u002F25\u002F19) and AC-277D-01 (Rev. 2; Effective: 2\u002F26\u002F21) reports show that you failed to document rationale to support your answers of “no” to the question posed in section 2 – “\u003Cem>In relation to the existing product, does the candidate product have a similar or less complex design?\u003C\u002Fem>” – despite the candidate devices having 4 grooves, a drive, or a male thread compared to the worst-case and comparison devices, which have none of these features.\u003C\u002Fp>\u003Cp> The AC-2772-02 report (Rev. 1; Effective: 3\u002F23\u002F20) shows that you incorrectly answered “no” to the question posed in section 2 – “\u003Cem>In relation to the existing product, does the candidate product have fewer\u002Fsmaller or equivalent cannulated portions or lumens?\u003C\u002Fem>” – when you compared the candidate device (segmental proximal femur, PF-2000L-02M), which has 7 cannulated holes, to the \u003Cstrong>(b)(4)\u003C\u002Fstrong> device (\u003Cstrong>(b)(4)\u003C\u002Fstrong>) and comparison devices (\u003Cstrong>(b)(4)\u003C\u002Fstrong>), which contain no holes.\u003C\u002Fp>\u003Cp>b. \u003Cstrong>(b)(4)\u003C\u002Fstrong> – Tier 1 \u003Cstrong>(b)(4)\u003C\u002Fstrong> Cleaner of ELEOS Implant Devices\u003C\u002Fp>\u003Cp>Although requested during the inspection, your Vice President of Quality Affairs and Regulatory Affairs was unable to provide documentation that you assessed the adequacy of the cleaning validations conducted in 2009 by this supplier, \u003Cstrong>(b)(4)\u003C\u002Fstrong>. In reviewing the “Process Validation of***\u003Cstrong>(b)(4)\u003C\u002Fstrong> Clean Line” Operational Qualification (OQ) (E118-2116; Rev. 1; Approved: 1\u002F9\u002F09) and Performance Qualification (PQ) (E118-2116; Rev. 1; Approved: 2\u002F3\u002F09), the following deficiencies were observed:\u003C\u002Fp>\u003Cp>i. The rationale in the PQ report to accept deviations from the nominal operating range of \u003Cstrong>(b)(4)\u003C\u002Fstrong>°F (\u003Cstrong>(b)(4)\u003C\u002Fstrong>, and \u003Cstrong>(b)(4)\u003C\u002Fstrong>°F) because OQ data showed that the process monitoring, total organic carbon (TOC), and gravimetric produced acceptable results at worst-case conditions for temperatures as low as \u003Cstrong>(b)(4)\u003C\u002Fstrong>°F and control charts indicated a lower control limit of \u003Cstrong>(b)(4)\u003C\u002Fstrong>°F (Deviation 3) does not take into account the vast differences in sample sizes (\u003Cstrong>(b)(4)\u003C\u002Fstrong> vs. \u003Cstrong>(b)(4)\u003C\u002Fstrong>) and acceptance criterion (Ppk \u003Cstrong>(b)(4)\u003C\u002Fstrong> vs. Ppk \u003Cstrong>(b)(4)\u003C\u002Fstrong>) between PQ and OQ for the same tests (TOC and gravimetric analysis) such that passing results for parameters established during OQ are not transferrable to PQ.\u003C\u002Fp>\u003Cp>ii. This supplier failed to document rationale in the OQ and PQ reports for why it was acceptable to convert all negative values measured for the corrected “\u003Cem>mass recovered from gravimetric\u003C\u002Fem> \u003Cstrong>(b)(4)\u003C\u002Fstrong> and corrected “\u003Cem>mass recovered from\u003C\u002Fem> \u003Cstrong>(b)(4)\u003C\u002Fstrong> to 0.00 mg in the “\u003Cem>Gravimetric Extraction Summary\u003C\u002Fem>” table during gravimetric testing, thereby passing the acceptance criteria of \u003Cstrong>(b)(4)\u003C\u002Fstrong> mg\u002Fcm\u003Csup>2\u003C\u002Fsup> (\u003Cstrong>(b)(4)\u003C\u002Fstrong>). For example, during OQ, an \u003Cstrong>(b)(4)\u003C\u002Fstrong> value as high as -1.59 mg for “Hip – 4” was converted to 0.00 mg without an explanation that accounts for the possibility of testing errors, inadequate test methodology (e.g., lack of sensitivity of testing methods), and uncalibrated state of measuring equipment.\u003C\u002Fp>\u003Cp>c. \u003Cstrong>(b)(4)\u003C\u002Fstrong> – \u003Cstrong>(b)(4)\u003C\u002Fstrong> Cleaner of ELEOS Implant Devices &amp; \u003Cstrong>(b)(4)\u003C\u002Fstrong> Cleaner of ELEOS Instruments\u003C\u002Fp>\u003Cp>You approved the adoption of new products into this supplier’s existing \u003Cstrong>(b)(4)\u003C\u002Fstrong> cleaning validations titled “\u003Cstrong>(b)(4)\u003C\u002Fstrong> Cleaning Equipment &amp; Performance Qualification Report” (FR_920-001; Rev. B; Effective: 3\u002F31\u002F15) and “Zenith Final Ultrasonic Cleaning Equipment &amp; Performance Qualification Report” (FR_920-001; Rev. B; Effective: 3\u002F31\u002F15) per your Cleaning, Assembly, Packaging and Sterility (CAPS) Checklists for Project # 16-001 (Approved 10\u002F2\u002F24) and Project # 16-003 (Approved 4\u002F19\u002F24) referencing memo “\u003Cstrong>(b)(4)\u003C\u002Fstrong> Cleaning” (2\u002F14\u002F19) and results of a 3rd party audit conducted 2\u002F23\u002F18 despite the following deficiencies:\u003C\u002Fp>\u003Cp>i. The OQ and PQ protocols failed to require documentation of the load configurations for all work orders in that the Vice President of Quality Affairs and Regulatory Affairs was not able to determine if devices were put in a \u003Cstrong>(b)(4)\u003C\u002Fstrong> or broken up into \u003Cstrong>(b)(4)\u003C\u002Fstrong>.\u003C\u002Fp>\u003Cp>ii. The PQ protocol failed to include documentation of valid statistical rationale for cytotoxicity, endotoxin, and\u002For particulate testing. For example, the quantity tested per work order (66672, 66921, 66922) for cytotoxicity and endotoxin was \u003Cstrong>(b)(4)\u003C\u002Fstrong> and \u003Cstrong>(b)(4)\u003C\u002Fstrong> respectively and the quantity tested per work order (66675, 66919, 66920) for cytotoxicity, endotoxin, and particulate was \u003Cstrong>(b)(4)\u003C\u002Fstrong> and \u003Cstrong>(b)(4)\u003C\u002Fstrong>, respectively.\u003C\u002Fp>\u003Cp>We reviewed your firm’s response and concluded that it is not adequate. The immediate correction is to impose heightened controls at each supplier commensurate with risk until new worst-case cleaning validations can be completed that addresses each of the observed deficiencies for \u003Cstrong>(b)(4)\u003C\u002Fstrong> by 1\u002F15\u002F26, \u003Cstrong>(b)(4)\u003C\u002Fstrong> (target date not provided), and \u003Cstrong>(b)(4)\u003C\u002Fstrong> by 3\u002F1\u002F26 at the latest.\u003C\u002Fp>\u003Cp>For \u003Cstrong>(b)(4)\u003C\u002Fstrong>, an assessment of worst-case part justification by family was completed to establish new limits placed on \u003Cstrong>(b)(4)\u003C\u002Fstrong>, and \u003Cstrong>(b)(4)\u003C\u002Fstrong>. You plan to add this new loading criteria to the final DHR review by 7\u002F15\u002F25. In addition, you plan to require an update to \u003Cstrong>(b)(4)\u003C\u002Fstrong> internal procedure to include predicate cleaning validation review by 7\u002F15\u002F25. Based on the results of the new cleaning validation, you plan to revise top level procedures by \u003Cstrong>(b)(4)\u003C\u002Fstrong>.\u003C\u002Fp>\u003Cp>For \u003Cstrong>(b)(4)\u003C\u002Fstrong>, an assessment of worst-case part justification was conducted and monitoring was put in place to control product release by assessing endotoxicity and cytotoxicity on a \u003Cstrong>(b)(4)\u003C\u002Fstrong> basis. In addition, you plan to require an update to this supplier’s internal procedures to improve notification of triggers to their customers by 7\u002F1\u002F25.\u003C\u002Fp>\u003Cp>For \u003Cstrong>(b)(4)\u003C\u002Fstrong>, you plan to conduct an assessment for worst-case part challenge per part family by \u003Cstrong>(b)(4)\u003C\u002Fstrong>. For all instruments, interim clean line controls were implemented to require shipment of instruments to your firm and analyses of those instruments, which includes worst-case part and part family assessments prior to adoption into your clean-line part family. All parts successfully assessed will then be cleaned using your validated clean line prior to release for commercial distribution. All implants will continue to be shipped to \u003Cstrong>(b)(4)\u003C\u002Fstrong> for \u003Cstrong>(b)(4)\u003C\u002Fstrong> cleaning and will fall under controls established for therein.\u003C\u002Fp>\u003Cp>Corrective actions include updating your supplier control and design control procedures to establish minimum requirements for cleaning validations of implants and instruments, including defining key product attributes to consider when forming product families and what considerations trigger a new worst-case within a product family or new product cleaning family; creation of a procedure for part families and worst-case parts per family which defines and evaluates implant and instrument cleaning families to facilitate consistent assessment of device cleaning families across products; determination and justification of minimum sample size and attributes (\u003Cstrong>(b)(4)\u003C\u002Fstrong>) for validations; development of a cleaning validation checklist and modification of a supplier audit checklist that captures the aforementioned worst-case part determination, sample sizes, and minimum attributes that will be used during supplier assessment as part of design transfer and new supplier onboarding, manufacturing transfer, and supplier audit; and periodic review of validations on a scheduled interval against new standards and requirements by 6\u002F15\u002F25.\u003C\u002Fp>\u003Cp>However, no target date was provided for the new cleaning validation planned for \u003Cstrong>(b)(4)\u003C\u002Fstrong>. Therefore, please provide a response regarding how you plan to address this deficiency. In addition, please continue to provide updates on the progress of your corrections and\u002For corrective actions, including any supporting evidence.\u003C\u002Fp>\u003Cp>\u003Cstrong>2. Failure to establish and maintain procedures for implementing corrective and preventive action, as required by 21 CFR 820.100(a).\u003C\u002Fstrong>\u003C\u002Fp>\u003Cp>Specifically, you failed to implement your Post Market Surveillance procedure (QP-18-004; Rev. 3; Effective: 6\u002F30\u002F22) which requires opening a CAPA when the \u003Cstrong>(b)(4)\u003C\u002Fstrong> analysis of infection complaints “***\u003Cem>is more than\u003C\u002Fem> \u003Cstrong>(b)(4)\u003C\u002Fstrong> \u003Cem>above the literature rate or\u003C\u002Fem> \u003Cstrong>(b)(4)\u003C\u002Fstrong> \u003Cem>are above the literature rate\u003C\u002Fem>***” for a given procedure type. For example, you did not initiate CAPAs when the \u003Cstrong>(b)(4)\u003C\u002Fstrong> analysis for infection complaints exceeded the rates of \u003Cstrong>(b)(4)\u003C\u002Fstrong>% for the distal femur (\u003Cstrong>(b)(4)\u003C\u002Fstrong>); \u003Cstrong>(b)(4)\u003C\u002Fstrong>% for proximal femur (\u003Cstrong>(b)(4)\u003C\u002Fstrong> and \u003Cstrong>(b)(4)\u003C\u002Fstrong>); and \u003Cstrong>(b)(4)\u003C\u002Fstrong>% for total femur (\u003Cstrong>(b)(4)\u003C\u002Fstrong> and \u003Cstrong>(b)(4)\u003C\u002Fstrong>) established in the journal article by Henderson et. al “\u003Cem>Failure Mode Classification for Tumor Endoprostheses: Retrospective Review of Five Institutions and a Literature Review\u003C\u002Fem>” (Journal Bone and Joint Surgery 2011) by \u003Cstrong>(b)(4)\u003C\u002Fstrong>.\u003C\u002Fp>\u003Cp>The adequacy of the response dated 5\u002F15\u002F25 cannot be determined at this time. Under CAPA 24-011 which was initiated on 9\u002F11\u002F24 to create a more robust methodology for trending and analyzing infection related complaints, you conducted a revised retrospective assessment of \u003Cstrong>(b)(4)\u003C\u002Fstrong> infection rates from \u003Cstrong>(b)(4)\u003C\u002Fstrong> to \u003Cstrong>(b)(4)\u003C\u002Fstrong> (TM-25-0002; Rev. B; Approved 5\u002F14\u002F25) based on additional literature data to support updated baseline infection rates by procedure type. As a part of the corrective action, you plan to create new work instructions with requirements to perform \u003Cstrong>(b)(4)\u003C\u002Fstrong> trend reporting for infections and \u003Cstrong>(b)(4)\u003C\u002Fstrong> or \u003Cstrong>(b)(4)\u003C\u002Fstrong> trend reports for all other postmarket surveillance key performance indicators (KPIs); revise management review presentation slides and quality planning, postmarket surveillance, complaint handling, and CAPA procedures; and provide training on the new procedures. Please continue to provide updates on the progress of your corrections and\u002For corrective actions, including any supporting evidence.\u003C\u002Fp>\u003Cp>\u003Cstrong>3. Failure to adequately establish and maintain procedures for validating the device design with regards to risk analysis, as required by 21 CFR 820.30(g).\u003C\u002Fstrong>\u003C\u002Fp>\u003Cp>Specifically, you failed to implement section 5.9 of your “Risk Management Process” procedure (SOP-008; Rev. 4-5; Effective: 3\u002F22\u002F23 - 1\u002F17\u002F25) which requires postmarket re-evaluation of risk management for a medical device as well as monitoring of postmarket information “***\u003Cem>for assurance that no unacceptable or previously unrecognized failure modes occur. In the event of such an occurrence the potential that the residual risk or its acceptability has changed and the impact on the previously implemented risk control measures shall be evaluated\u003C\u002Fem>***.” For example, you failed to utilize the real rate of occurrence for loosening in complaints PCR 11272023-1 (\u003Cstrong>(b)(4)\u003C\u002Fstrong>), PCR 05132024-1 (\u003Cstrong>(b)(4)\u003C\u002Fstrong>), and PCR 10172024-1 (\u003Cstrong>(b)(4)\u003C\u002Fstrong>) calculated at 3.27%, 0.149%, and 3.1%, respectively, to evaluate the need to update the occurrence rating in the corresponding ELEOS Stem Implant Risk Table (Project # 16-001\u002F16-003; Rev. E; Approved: 4\u002F1\u002F19), which remains unchanged at \u003Cstrong>(b)(4)\u003C\u002Fstrong>% through \u003Cstrong>(b)(4)\u003C\u002Fstrong>% since April 1, 2019.\u003C\u002Fp>\u003Cp>An update to the postmarket rate of occurrence changes the failure mode from an acceptable risk to a conditionally acceptable risk, thereby requiring an evaluation for the need for additional risk controls and assessment for the acceptability of the residual risk as required under sections 5.6 and 5.7 of SOP-008.\u003C\u002Fp>\u003Cp>The adequacy of the response dated 5\u002F15\u002F25 cannot be determined at this time. The immediate correction is to evaluate literature, sources, historical data, and\u002For engineering estimates against postmarket data and update the occurrence rates for the hazardous situations associated with the ELEOS Limb Salvage system by \u003Cstrong>(b)(4)\u003C\u002Fstrong> followed by a revision of the corresponding risk tables by \u003Cstrong>(b)(4)\u003C\u002Fstrong>. As a part of the corrective action, you plan to revise SOP-008 to ensure that the methods used to create and maintain risk assessment tables are well-defined and create work instructions for conducting risk assessments utilizing postmarket information by \u003Cstrong>(b)(4)\u003C\u002Fstrong>. Please continue to provide updates on the progress of your corrections and\u002For corrective actions, including any supporting evidence.\u003C\u002Fp>\u003Cp>\u003Cstrong>4. Failure to establish and maintain procedures for identifying valid statistical techniques required for establishing, controlling, and verifying the acceptability of process capability and product characteristics, as required by 21 CFR 820.250(a).\u003C\u002Fstrong>\u003C\u002Fp>\u003Cp>Specifically, you failed to implement section 1.1 of your “Sample Size and Statistical Techniques” procedure (SOP-014; Rev. 2-4; Effective: 8\u002F16\u002F18 - 3\u002F22\u002F23) which “***\u003Cem>identifies valid statistical techniques that are used to establish, control and verify the acceptability of process capability and product characteristics***” pertaining to “***inspections and other analyses of objective data\u003C\u002Fem>***” of ELEOS Implant Devices received from \u003Cstrong>(b)(4)\u003C\u002Fstrong>. during incoming inspections. For example, your Vice President of Quality Affairs and Regulatory Affairs acknowledged that the sampling plans of the \u003Cstrong>(b)(4)\u003C\u002Fstrong> sampled incoming device history records (DHRs) from this supplier were not traceable to a documented valid statistical rationale.\u003C\u002Fp>\u003Cp>a. You reviewed and approved incoming DHRs for Lot # \u003Cstrong>(b)(4)\u003C\u002Fstrong> and Lot # \u003Cstrong>(b)(4)\u003C\u002Fstrong> on 11\u002F2\u002F20 and 11\u002F29\u002F21 where a sampling plan of \u003Cstrong>(b)(4)\u003C\u002Fstrong> was used to inspect critical features during in-process inspections for which there is no documented rationale for use of this sampling plan. For example, out of \u003Cstrong>(b)(4)\u003C\u002Fstrong> ELEOS Tibial Baseplate Component, Size 4 (Part # TB-2204E-01M) Implant Devices, the line profile (curve) for \u003Cstrong>(b)(4)\u003C\u002Fstrong> each were inspected against a specification of \u003Cstrong>(b)(4)\u003C\u002Fstrong> at \u003Cstrong>(b)(4)\u003C\u002Fstrong> for Lot # \u003Cstrong>(b)(4)\u003C\u002Fstrong>. Similarly, out of \u003Cstrong>(b)(4)\u003C\u002Fstrong> ELEOS Collar, 28 Diameter, Round, Porous, HA Treated (Part # HB-2800R-03M) Implant Devices, the diameter for \u003Cstrong>(b)(4)\u003C\u002Fstrong> each was inspected against a specification of \u003Cstrong>(b)(4)\u003C\u002Fstrong> at \u003Cstrong>(b)(4)\u003C\u002Fstrong> for Lot # \u003Cstrong>(b)(4)\u003C\u002Fstrong>.\u003C\u002Fp>\u003Cp>b. You reviewed and approved incoming DHRs (Lot #: \u003Cstrong>(b)(4)\u003C\u002Fstrong>) where sampling plans utilized an AQL (acceptable quality limit) of \u003Cstrong>(b)(4)\u003C\u002Fstrong> or \u003Cstrong>(b)(4)\u003C\u002Fstrong> to inspect features during in-process and final inspections for which there are no documented rationales for use of these sampling plans. For example, out of \u003Cstrong>(b)(4)\u003C\u002Fstrong> ELEOS Segmental Proximal Femur, Plasma Spray, Left 98 MM (Part # PF-2000L-02M) Implant Devices, the dimensional specification of \u003Cstrong>(b)(4)\u003C\u002Fstrong> was inspected at an AQL level of \u003Cstrong>(b)(4)\u003C\u002Fstrong> for Lot # \u003Cstrong>(b)(4)\u003C\u002Fstrong> during final inspection on 1\u002F23\u002F24.\u003C\u002Fp>\u003Cp>We reviewed your firm’s response and concluded that it is not adequate. The immediate corrections are to use a checklist to reassess and document rationales for acceptability of the existing AQLs selected for all contract manufactured ELEOS part families from 1\u002F1\u002F21 to 4\u002F1\u002F25 and share the rationales with the contract manufacturers by 11\u002F21\u002F25 and update SCAR 25-01 to require the contract manufacturer to include documented evidence for all inspected dimensions and associated AQL quantities by 5\u002F14\u002F25. As a part of the corrective actions, you plan to update SOP-014 and WI-013-31 (Incoming Inspection Process) to require review of incoming inspection results, consolidation of sampling procedures, set up traceable valid statistical rationales, and confirm AQLs by 7\u002F6\u002F25; update SOP-007 (Design Control) and various design transfer, manufacturing transfer, supplier, and incoming inspection checklists to include instructions for the acceptance of a supplier’s sampling procedure with confirmation of conformance to those procedures during incoming inspection of supplier DHRs by \u003Cstrong>(b)(4)\u003C\u002Fstrong>; and develop \u003Cstrong>(b)(4)\u003C\u002Fstrong> inspection requirement checklists for all suppliers with a sampling procedure traceable to a valid statistical rationale based on \u003Cstrong>(b)(4)\u003C\u002Fstrong> by 7\u002F18\u002F25. However, these corrections and\u002For corrective actions only address the need to have a statistically valid rationale for the use of sampling plans which follow AQL and not sampling plans which utilize inspections of select critical features for the \u003Cstrong>(b)(4)\u003C\u002Fstrong> devices. Therefore, please provide a response on how you plan to address the above deficiency. In addition, please continue to provide updates on the progress of your corrections and\u002For corrective actions, including any supporting evidence.\u003C\u002Fp>\u003Cp>\u003Cstrong>\u003Cu>Corrections and Removals Violation(s)\u003C\u002Fu>\u003C\u002Fstrong>\u003C\u002Fp>\u003Cp>Our inspection also revealed that your firm’s ELEOS Limb Salvage System devices are misbranded under section 502(t)(2) of the Act, 21 U.S.C. § 352(t)(2), in that your firm failed or refused to furnish material or information respecting the device that is required by or under section 519 of the Act, 21 U.S.C. § 360i, and 21 CFR Part 806 – Medical Devices; Reports of Corrections and Removals. Significant violations include, but are not limited to, the following:\u003C\u002Fp>\u003Cp>\u003Cstrong>5. Failure to submit a medical device Report of Correction or Removal for an action initiated to reduce a risk to health posed by the device or remedy a violation which may present a risk to health, as required by 21 CFR Part 806.10. For example:\u003C\u002Fstrong>\u003C\u002Fp>\u003Cp>a. Your firm conducted a removal of numerous part numbers and lot numbers of your ELEOS Limb Salvage System due to sterile packaging separation and damaged trays, which can result in extended surgery time or potential patient infection. Your firm sent a Customer Notification for this issue on 6\u002F28\u002F2023. This action meets the definition of a medical device correction or removal initiated to reduce a risk to health or remedy a violation which may present a risk to health, for which you are required to submit a Report of Correction or Removal to FDA. You did not submit a Medical Device Report of Correction or Removal to FDA for this action until after the investigation and citation.\u003C\u002Fp>\u003Cp>b. On or about 10\u002F15\u002F2024, your firm conducted a removal of your ELEOS Limb Salvage System, Male-Female Midsection 40MM, due to taper post misalignment, which can result in extended surgery time or improperly assembled devices leading to future disassociation. Your firm sent a Customer Notification for this issue dated 9\u002F20\u002F2024. This action meets the definition of a medical device correction or removal initiated to remedy a violation which may present a risk to health, for which you are required to submit a Report of Correction or Removal to FDA. You did not submit a Medical Device Report of Correction or Removal to FDA for this action until after the investigation and citation.\u003C\u002Fp>\u003Cp>c. On or about 1\u002F22\u002F2024, your firm conducted a removal of your ELEOS Limb Salvage System, Collar Stem, Cemented, Fluted 13MM X 120MM and Collar Stem, Cemented, Fluted 15MM X 120MM due to mislabeling of the devices, which can result in implantation or attempted implantation of an incorrect stem size, potentially extending surgery time or causing the patient to need revision surgery. Your firm sent a Customer Notification for this issue on 12\u002F22\u002F2023. This action meets the definition of a medical device correction or removal initiated to remedy a violation which may present a risk to health, for which you are required to submit a Report of Correction or Removal to FDA. You did not submit a Medical Device Report of Correction or Removal to FDA for this action until after the investigation and citation.\u003C\u002Fp>\u003Cp>The adequacy of your firm’s response, dated 5\u002F14\u002F2025, regarding Observation 5 cannot be determined because we do not have assurance that your firm will make appropriate decisions following 21 CFR 806 in the future, based on your firm’s root cause stating that your firm’s SOP is ambiguous and subjective. Your firm adequately reported by retroactively submitting Reports of Correction or Removal to FDA addressing each of the three issues on 4\u002F25\u002F2025.\u003C\u002Fp>\u003Cp>Your firm should take prompt action to address any violations identified in this letter. Failure to adequately address this matter may result in regulatory action being initiated by the FDA without further notice. These actions include, but are not limited to, seizure, injunction, and civil money penalties.\u003C\u002Fp>\u003Cp>Other federal agencies may take your compliance with the FD&amp;C Act and its implementing regulations into account when considering the award of federal contracts. Additionally, should FDA determine that you have Quality System regulation violations that are reasonably related to premarket approval applications for Class III devices, such devices will not be approved until the violations have been addressed. Should FDA determine that your devices or facilities do not meet the requirements of the Act, requests for Certificates to Foreign Governments (CFG) may not be granted.\u003C\u002Fp>\u003Cp>Please notify this office in writing within fifteen business days from the date you receive this letter of the specific steps your firm has taken to address the noted violations, as well as an explanation of how your firm plans to prevent these violations, or similar violations, from occurring again. Include documentation of the corrections and\u002For corrective actions (which must address systemic problems) that your firm has taken. If your firm’s planned corrections and\u002For corrective actions will occur over time, please include a timetable for implementation of those activities. If corrections and\u002For corrective actions cannot be completed within fifteen business days, state the reason for the delay and the time within which these activities will be completed. Your firm’s response should be comprehensive and address any violations included in this Warning Letter. If you believe that your products are not in violation of the FD&amp;C Act, include your reasoning and any supporting information for our consideration as part of your response.\u003C\u002Fp>\u003Cp>Your firm’s response should be sent via email to Gina Brackett, Establishment Assessment Team 1 (EAT-1) Assistant Director at CDRHEnforcement@fda.hhs.gov. Please include in the subject line, “CMS Case # 712573” when replying. If you have any questions about the contents of this letter, please contact: Sargum C. Morgan, Compliance Officer at sargum.morgan@fda.hhs.gov.\u003C\u002Fp>\u003Cp>Finally, you should know that this letter is not intended to be an all-inclusive list of the violations at your firm’s facility. It is your firm’s responsibility to ensure compliance with applicable laws and regulations administered by FDA. The specific violations noted in this letter and in the Inspectional Observations, FDA 483, issued at the close of the inspection may be symptomatic of serious problems in your firm’s manufacturing and quality management systems. Your firm should investigate and determine the causes of any violations and take prompt actions to address any violations and bring the products into compliance.\u003C\u002Fp>\u003Cp>Sincerely,\u003Cbr>\u002FS\u002F\u003C\u002Fp>\u003Cp>Matthew G. Hillebrenner\u003Cbr>Deputy Director\u003Cbr>Office of Product Evaluation and Quality\u003Cbr>Center for Devices and Radiological Health\u003C\u002Fp>\u003Cp>CC: Len Tokish\u003Cbr>VP of Quality Assurance &amp; Regulatory Affairs\u003Cbr>ltokish@onkossurgical.com\u003C\u002Fp>\n\n\n\n\n\n\n              \n                                            \n              \n            ","Delivery Method:\n\nVIA Electronic Mail\n\nProduct:\n\nMedical Devices\n\nRecipient:\n\nRecipient Name\n\nPatrick J. Treacy\n\nRecipient Title\n\nPresident and CEO\n\nOnkos Surgical, Inc.\n\n77 E Halsey Rd\n\nParsippany, NJ 07054\n\nUnited States\n\nptreacy@onkossurgical.com\n\nIssuing Office:\n\nCenter for Devices and Radiological Health\n\nUnited States\n\nWARNING LETTER\nCMS # 712573\nJuly 21, 2025\nDear Mr. Patrick J. Treacy:\nDuring an inspection of your firm located in Parsippany, NJ from February 4, 2025 through April 4, 2025, an investigator (or investigators) from the United States Food and Drug Administration (FDA) determined that your firm is a specification developer of the ELEOS Limb Salvage System indicated for use in total hip and knee arthroplasty for reduction or relief of pain and\u002For improved hip function in skeletally mature patients with select conditions. Under section 201(h) of the Federal Food, Drug, and Cosmetic Act (the Act), 21 U.S.C. § 321(h), these products are devices because they are intended for use in the diagnosis of disease or other conditions or in the cure, mitigation, treatment, or prevention of disease, or to affect the structure or any function of the body.\nQuality System Regulation Violation(s)\nThis inspection revealed that these devices are adulterated within the meaning of section 501(h) of the Act, 21 U.S.C. § 351(h), in that the methods used in, or the facilities or controls used for, their manufacture, packing, storage, or installation are not in conformity with the current good manufacturing practice requirements of the Quality System regulation found at Title 21, Code of Federal Regulations (CFR), Part 820.\nWe received a response from Len Tokish, Vice President of Quality Assurance and Regulatory Affairs dated May 15, 2025, concerning our investigator’s observations noted on the Form FDA 483 (FDA 483), List of Inspectional Observations, that was issued to your firm. We address this response below, in relation to each of the noted violations. These violations include, but are not limited to, the following:\n1. Failure to establish and maintain procedures to ensure that all purchased or otherwise received product and services conform to specified requirements, including quality requirements, that must be met by suppliers, contractors, and consultants and define the type and extent of control to be exercised over the product, services, suppliers, contractors, and consultants, based on the evaluation results, as required by 21 CFR 820.50.\nSpecifically, you failed to adequately implement the “Approved Supplier List” section of your “Supplier, Purchasing and Inspection Controls” procedure (SOP-013; Rev. 0-6; Effective: 4\u002F25\u002F16 - 2\u002F3\u002F25) which requires that you “ensure compliance to ISO 13485” for your Tier 1 suppliers as a “method of control” over approved suppliers. For example, you did not ensure compliance to the process validation requirements (clause 7.5.6) of ISO 13485 (Medical Devices – Quality Management Systems – Requirements for regulatory purposes) for the following three (3) Tier 1 suppliers in that you failed to adequately assess and\u002For document an assessment of the acceptability of their cleaning validations meant to demonstrate that in-process or final cleaning of your ELEOS Implant Devices and Instruments consistently meet your specifications for cleanliness:\na. (b)(4) – Tier (b)(4) Final Cleaner of ELEOS Implant Devices\ni. You approved the (b)(4) cleaning validation test report TR-2771D-01 (Rev. 1-2; Approved: 1\u002F24\u002F19 and 9\u002F10\u002F21) from this supplier despite it failing to define the maximum allowable devices per gallon per run, as required by section 9.2 of the corresponding test protocol TP-2771D-01 (Rev. 2; Approved: 9\u002F10\u002F21) which states “***The main cleaning parameters that can impact the efficacy of the cleaning process include ***Quantity of parts ((b)(4))***.”\nSimilarly, you approved (b)(4) cleaning validation test report TR-2771E-01 (Rev. 1; Approved: 3\u002F18\u002F19) from this supplier despite it failing to document the maximum allowable quantity of (b)(4) and (b)(4) per run, as required by sections 9.3, 9.4, and 9.5 of the corresponding test protocol TP-2771E-01 (Rev. 1; Approved: 8\u002F28\u002F18) which state “***To validate the cleaning process, parts shall be cleaned using (b)(4) over (b)(4) runs***To create a (b)(4) batch of product***Clean what is expected to be a “(b)(4)” load in (b)(4)***A cleaning process should not alter the appearance of parts or cause damage. If applicable, appropriate fixtures to hold the components during cleaning should be included in the study and used in routine production***.”\nii. You failed to adequately assess differences in product design and geometrical configurations of candidate devices for the adoption into device families of existing (b)(4) cleaning validations conducted by this supplier because you did not accurately answer guiding questions contained in your “Assessment of Product Change or New Product Adoption for Cleaning Processes” reports. For example:\n The AC-2772-01 (Rev. 01; Effective: 7\u002F25\u002F19) and AC-277D-01 (Rev. 2; Effective: 2\u002F26\u002F21) reports show that you failed to document rationale to support your answers of “no” to the question posed in section 2 – “In relation to the existing product, does the candidate product have a similar or less complex design?” – despite the candidate devices having 4 grooves, a drive, or a male thread compared to the worst-case and comparison devices, which have none of these features.\n The AC-2772-02 report (Rev. 1; Effective: 3\u002F23\u002F20) shows that you incorrectly answered “no” to the question posed in section 2 – “In relation to the existing product, does the candidate product have fewer\u002Fsmaller or equivalent cannulated portions or lumens?” – when you compared the candidate device (segmental proximal femur, PF-2000L-02M), which has 7 cannulated holes, to the (b)(4) device ((b)(4)) and comparison devices ((b)(4)), which contain no holes.\nb. (b)(4) – Tier 1 (b)(4) Cleaner of ELEOS Implant Devices\nAlthough requested during the inspection, your Vice President of Quality Affairs and Regulatory Affairs was unable to provide documentation that you assessed the adequacy of the cleaning validations conducted in 2009 by this supplier, (b)(4). In reviewing the “Process Validation of***(b)(4) Clean Line” Operational Qualification (OQ) (E118-2116; Rev. 1; Approved: 1\u002F9\u002F09) and Performance Qualification (PQ) (E118-2116; Rev. 1; Approved: 2\u002F3\u002F09), the following deficiencies were observed:\ni. The rationale in the PQ report to accept deviations from the nominal operating range of (b)(4)°F ((b)(4), and (b)(4)°F) because OQ data showed that the process monitoring, total organic carbon (TOC), and gravimetric produced acceptable results at worst-case conditions for temperatures as low as (b)(4)°F and control charts indicated a lower control limit of (b)(4)°F (Deviation 3) does not take into account the vast differences in sample sizes ((b)(4) vs. (b)(4)) and acceptance criterion (Ppk (b)(4) vs. Ppk (b)(4)) between PQ and OQ for the same tests (TOC and gravimetric analysis) such that passing results for parameters established during OQ are not transferrable to PQ.\nii. This supplier failed to document rationale in the OQ and PQ reports for why it was acceptable to convert all negative values measured for the corrected “mass recovered from gravimetric (b)(4) and corrected “mass recovered from (b)(4) to 0.00 mg in the “Gravimetric Extraction Summary” table during gravimetric testing, thereby passing the acceptance criteria of (b)(4) mg\u002Fcm2 ((b)(4)). For example, during OQ, an (b)(4) value as high as -1.59 mg for “Hip – 4” was converted to 0.00 mg without an explanation that accounts for the possibility of testing errors, inadequate test methodology (e.g., lack of sensitivity of testing methods), and uncalibrated state of measuring equipment.\nc. (b)(4) – (b)(4) Cleaner of ELEOS Implant Devices & (b)(4) Cleaner of ELEOS Instruments\nYou approved the adoption of new products into this supplier’s existing (b)(4) cleaning validations titled “(b)(4) Cleaning Equipment & Performance Qualification Report” (FR_920-001; Rev. B; Effective: 3\u002F31\u002F15) and “Zenith Final Ultrasonic Cleaning Equipment & Performance Qualification Report” (FR_920-001; Rev. B; Effective: 3\u002F31\u002F15) per your Cleaning, Assembly, Packaging and Sterility (CAPS) Checklists for Project # 16-001 (Approved 10\u002F2\u002F24) and Project # 16-003 (Approved 4\u002F19\u002F24) referencing memo “(b)(4) Cleaning” (2\u002F14\u002F19) and results of a 3rd party audit conducted 2\u002F23\u002F18 despite the following deficiencies:\ni. The OQ and PQ protocols failed to require documentation of the load configurations for all work orders in that the Vice President of Quality Affairs and Regulatory Affairs was not able to determine if devices were put in a (b)(4) or broken up into (b)(4).\nii. The PQ protocol failed to include documentation of valid statistical rationale for cytotoxicity, endotoxin, and\u002For particulate testing. For example, the quantity tested per work order (66672, 66921, 66922) for cytotoxicity and endotoxin was (b)(4) and (b)(4) respectively and the quantity tested per work order (66675, 66919, 66920) for cytotoxicity, endotoxin, and particulate was (b)(4) and (b)(4), respectively.\nWe reviewed your firm’s response and concluded that it is not adequate. The immediate correction is to impose heightened controls at each supplier commensurate with risk until new worst-case cleaning validations can be completed that addresses each of the observed deficiencies for (b)(4) by 1\u002F15\u002F26, (b)(4) (target date not provided), and (b)(4) by 3\u002F1\u002F26 at the latest.\nFor (b)(4), an assessment of worst-case part justification by family was completed to establish new limits placed on (b)(4), and (b)(4). You plan to add this new loading criteria to the final DHR review by 7\u002F15\u002F25. In addition, you plan to require an update to (b)(4) internal procedure to include predicate cleaning validation review by 7\u002F15\u002F25. Based on the results of the new cleaning validation, you plan to revise top level procedures by (b)(4).\nFor (b)(4), an assessment of worst-case part justification was conducted and monitoring was put in place to control product release by assessing endotoxicity and cytotoxicity on a (b)(4) basis. In addition, you plan to require an update to this supplier’s internal procedures to improve notification of triggers to their customers by 7\u002F1\u002F25.\nFor (b)(4), you plan to conduct an assessment for worst-case part challenge per part family by (b)(4). For all instruments, interim clean line controls were implemented to require shipment of instruments to your firm and analyses of those instruments, which includes worst-case part and part family assessments prior to adoption into your clean-line part family. All parts successfully assessed will then be cleaned using your validated clean line prior to release for commercial distribution. All implants will continue to be shipped to (b)(4) for (b)(4) cleaning and will fall under controls established for therein.\nCorrective actions include updating your supplier control and design control procedures to establish minimum requirements for cleaning validations of implants and instruments, including defining key product attributes to consider when forming product families and what considerations trigger a new worst-case within a product family or new product cleaning family; creation of a procedure for part families and worst-case parts per family which defines and evaluates implant and instrument cleaning families to facilitate consistent assessment of device cleaning families across products; determination and justification of minimum sample size and attributes ((b)(4)) for validations; development of a cleaning validation checklist and modification of a supplier audit checklist that captures the aforementioned worst-case part determination, sample sizes, and minimum attributes that will be used during supplier assessment as part of design transfer and new supplier onboarding, manufacturing transfer, and supplier audit; and periodic review of validations on a scheduled interval against new standards and requirements by 6\u002F15\u002F25.\nHowever, no target date was provided for the new cleaning validation planned for (b)(4). Therefore, please provide a response regarding how you plan to address this deficiency. In addition, please continue to provide updates on the progress of your corrections and\u002For corrective actions, including any supporting evidence.\n2. Failure to establish and maintain procedures for implementing corrective and preventive action, as required by 21 CFR 820.100(a).\nSpecifically, you failed to implement your Post Market Surveillance procedure (QP-18-004; Rev. 3; Effective: 6\u002F30\u002F22) which requires opening a CAPA when the (b)(4) analysis of infection complaints “***is more than (b)(4) above the literature rate or (b)(4) are above the literature rate***” for a given procedure type. For example, you did not initiate CAPAs when the (b)(4) analysis for infection complaints exceeded the rates of (b)(4)% for the distal femur ((b)(4)); (b)(4)% for proximal femur ((b)(4) and (b)(4)); and (b)(4)% for total femur ((b)(4) and (b)(4)) established in the journal article by Henderson et. al “Failure Mode Classification for Tumor Endoprostheses: Retrospective Review of Five Institutions and a Literature Review” (Journal Bone and Joint Surgery 2011) by (b)(4).\nThe adequacy of the response dated 5\u002F15\u002F25 cannot be determined at this time. Under CAPA 24-011 which was initiated on 9\u002F11\u002F24 to create a more robust methodology for trending and analyzing infection related complaints, you conducted a revised retrospective assessment of (b)(4) infection rates from (b)(4) to (b)(4) (TM-25-0002; Rev. B; Approved 5\u002F14\u002F25) based on additional literature data to support updated baseline infection rates by procedure type. As a part of the corrective action, you plan to create new work instructions with requirements to perform (b)(4) trend reporting for infections and (b)(4) or (b)(4) trend reports for all other postmarket surveillance key performance indicators (KPIs); revise management review presentation slides and quality planning, postmarket surveillance, complaint handling, and CAPA procedures; and provide training on the new procedures. Please continue to provide updates on the progress of your corrections and\u002For corrective actions, including any supporting evidence.\n3. Failure to adequately establish and maintain procedures for validating the device design with regards to risk analysis, as required by 21 CFR 820.30(g).\nSpecifically, you failed to implement section 5.9 of your “Risk Management Process” procedure (SOP-008; Rev. 4-5; Effective: 3\u002F22\u002F23 - 1\u002F17\u002F25) which requires postmarket re-evaluation of risk management for a medical device as well as monitoring of postmarket information “***for assurance that no unacceptable or previously unrecognized failure modes occur. In the event of such an occurrence the potential that the residual risk or its acceptability has changed and the impact on the previously implemented risk control measures shall be evaluated***.” For example, you failed to utilize the real rate of occurrence for loosening in complaints PCR 11272023-1 ((b)(4)), PCR 05132024-1 ((b)(4)), and PCR 10172024-1 ((b)(4)) calculated at 3.27%, 0.149%, and 3.1%, respectively, to evaluate the need to update the occurrence rating in the corresponding ELEOS Stem Implant Risk Table (Project # 16-001\u002F16-003; Rev. E; Approved: 4\u002F1\u002F19), which remains unchanged at (b)(4)% through (b)(4)% since April 1, 2019.\nAn update to the postmarket rate of occurrence changes the failure mode from an acceptable risk to a conditionally acceptable risk, thereby requiring an evaluation for the need for additional risk controls and assessment for the acceptability of the residual risk as required under sections 5.6 and 5.7 of SOP-008.\nThe adequacy of the response dated 5\u002F15\u002F25 cannot be determined at this time. The immediate correction is to evaluate literature, sources, historical data, and\u002For engineering estimates against postmarket data and update the occurrence rates for the hazardous situations associated with the ELEOS Limb Salvage system by (b)(4) followed by a revision of the corresponding risk tables by (b)(4). As a part of the corrective action, you plan to revise SOP-008 to ensure that the methods used to create and maintain risk assessment tables are well-defined and create work instructions for conducting risk assessments utilizing postmarket information by (b)(4). Please continue to provide updates on the progress of your corrections and\u002For corrective actions, including any supporting evidence.\n4. Failure to establish and maintain procedures for identifying valid statistical techniques required for establishing, controlling, and verifying the acceptability of process capability and product characteristics, as required by 21 CFR 820.250(a).\nSpecifically, you failed to implement section 1.1 of your “Sample Size and Statistical Techniques” procedure (SOP-014; Rev. 2-4; Effective: 8\u002F16\u002F18 - 3\u002F22\u002F23) which “***identifies valid statistical techniques that are used to establish, control and verify the acceptability of process capability and product characteristics***” pertaining to “***inspections and other analyses of objective data***” of ELEOS Implant Devices received from (b)(4). during incoming inspections. For example, your Vice President of Quality Affairs and Regulatory Affairs acknowledged that the sampling plans of the (b)(4) sampled incoming device history records (DHRs) from this supplier were not traceable to a documented valid statistical rationale.\na. You reviewed and approved incoming DHRs for Lot # (b)(4) and Lot # (b)(4) on 11\u002F2\u002F20 and 11\u002F29\u002F21 where a sampling plan of (b)(4) was used to inspect critical features during in-process inspections for which there is no documented rationale for use of this sampling plan. For example, out of (b)(4) ELEOS Tibial Baseplate Component, Size 4 (Part # TB-2204E-01M) Implant Devices, the line profile (curve) for (b)(4) each were inspected against a specification of (b)(4) at (b)(4) for Lot # (b)(4). Similarly, out of (b)(4) ELEOS Collar, 28 Diameter, Round, Porous, HA Treated (Part # HB-2800R-03M) Implant Devices, the diameter for (b)(4) each was inspected against a specification of (b)(4) at (b)(4) for Lot # (b)(4).\nb. You reviewed and approved incoming DHRs (Lot #: (b)(4)) where sampling plans utilized an AQL (acceptable quality limit) of (b)(4) or (b)(4) to inspect features during in-process and final inspections for which there are no documented rationales for use of these sampling plans. For example, out of (b)(4) ELEOS Segmental Proximal Femur, Plasma Spray, Left 98 MM (Part # PF-2000L-02M) Implant Devices, the dimensional specification of (b)(4) was inspected at an AQL level of (b)(4) for Lot # (b)(4) during final inspection on 1\u002F23\u002F24.\nWe reviewed your firm’s response and concluded that it is not adequate. The immediate corrections are to use a checklist to reassess and document rationales for acceptability of the existing AQLs selected for all contract manufactured ELEOS part families from 1\u002F1\u002F21 to 4\u002F1\u002F25 and share the rationales with the contract manufacturers by 11\u002F21\u002F25 and update SCAR 25-01 to require the contract manufacturer to include documented evidence for all inspected dimensions and associated AQL quantities by 5\u002F14\u002F25. As a part of the corrective actions, you plan to update SOP-014 and WI-013-31 (Incoming Inspection Process) to require review of incoming inspection results, consolidation of sampling procedures, set up traceable valid statistical rationales, and confirm AQLs by 7\u002F6\u002F25; update SOP-007 (Design Control) and various design transfer, manufacturing transfer, supplier, and incoming inspection checklists to include instructions for the acceptance of a supplier’s sampling procedure with confirmation of conformance to those procedures during incoming inspection of supplier DHRs by (b)(4); and develop (b)(4) inspection requirement checklists for all suppliers with a sampling procedure traceable to a valid statistical rationale based on (b)(4) by 7\u002F18\u002F25. However, these corrections and\u002For corrective actions only address the need to have a statistically valid rationale for the use of sampling plans which follow AQL and not sampling plans which utilize inspections of select critical features for the (b)(4) devices. Therefore, please provide a response on how you plan to address the above deficiency. In addition, please continue to provide updates on the progress of your corrections and\u002For corrective actions, including any supporting evidence.\nCorrections and Removals Violation(s)\nOur inspection also revealed that your firm’s ELEOS Limb Salvage System devices are misbranded under section 502(t)(2) of the Act, 21 U.S.C. § 352(t)(2), in that your firm failed or refused to furnish material or information respecting the device that is required by or under section 519 of the Act, 21 U.S.C. § 360i, and 21 CFR Part 806 – Medical Devices; Reports of Corrections and Removals. Significant violations include, but are not limited to, the following:\n5. Failure to submit a medical device Report of Correction or Removal for an action initiated to reduce a risk to health posed by the device or remedy a violation which may present a risk to health, as required by 21 CFR Part 806.10. For example:\na. Your firm conducted a removal of numerous part numbers and lot numbers of your ELEOS Limb Salvage System due to sterile packaging separation and damaged trays, which can result in extended surgery time or potential patient infection. Your firm sent a Customer Notification for this issue on 6\u002F28\u002F2023. This action meets the definition of a medical device correction or removal initiated to reduce a risk to health or remedy a violation which may present a risk to health, for which you are required to submit a Report of Correction or Removal to FDA. You did not submit a Medical Device Report of Correction or Removal to FDA for this action until after the investigation and citation.\nb. On or about 10\u002F15\u002F2024, your firm conducted a removal of your ELEOS Limb Salvage System, Male-Female Midsection 40MM, due to taper post misalignment, which can result in extended surgery time or improperly assembled devices leading to future disassociation. Your firm sent a Customer Notification for this issue dated 9\u002F20\u002F2024. This action meets the definition of a medical device correction or removal initiated to remedy a violation which may present a risk to health, for which you are required to submit a Report of Correction or Removal to FDA. You did not submit a Medical Device Report of Correction or Removal to FDA for this action until after the investigation and citation.\nc. On or about 1\u002F22\u002F2024, your firm conducted a removal of your ELEOS Limb Salvage System, Collar Stem, Cemented, Fluted 13MM X 120MM and Collar Stem, Cemented, Fluted 15MM X 120MM due to mislabeling of the devices, which can result in implantation or attempted implantation of an incorrect stem size, potentially extending surgery time or causing the patient to need revision surgery. Your firm sent a Customer Notification for this issue on 12\u002F22\u002F2023. This action meets the definition of a medical device correction or removal initiated to remedy a violation which may present a risk to health, for which you are required to submit a Report of Correction or Removal to FDA. You did not submit a Medical Device Report of Correction or Removal to FDA for this action until after the investigation and citation.\nThe adequacy of your firm’s response, dated 5\u002F14\u002F2025, regarding Observation 5 cannot be determined because we do not have assurance that your firm will make appropriate decisions following 21 CFR 806 in the future, based on your firm’s root cause stating that your firm’s SOP is ambiguous and subjective. Your firm adequately reported by retroactively submitting Reports of Correction or Removal to FDA addressing each of the three issues on 4\u002F25\u002F2025.\nYour firm should take prompt action to address any violations identified in this letter. Failure to adequately address this matter may result in regulatory action being initiated by the FDA without further notice. These actions include, but are not limited to, seizure, injunction, and civil money penalties.\nOther federal agencies may take your compliance with the FD&C Act and its implementing regulations into account when considering the award of federal contracts. Additionally, should FDA determine that you have Quality System regulation violations that are reasonably related to premarket approval applications for Class III devices, such devices will not be approved until the violations have been addressed. Should FDA determine that your devices or facilities do not meet the requirements of the Act, requests for Certificates to Foreign Governments (CFG) may not be granted.\nPlease notify this office in writing within fifteen business days from the date you receive this letter of the specific steps your firm has taken to address the noted violations, as well as an explanation of how your firm plans to prevent these violations, or similar violations, from occurring again. Include documentation of the corrections and\u002For corrective actions (which must address systemic problems) that your firm has taken. If your firm’s planned corrections and\u002For corrective actions will occur over time, please include a timetable for implementation of those activities. If corrections and\u002For corrective actions cannot be completed within fifteen business days, state the reason for the delay and the time within which these activities will be completed. Your firm’s response should be comprehensive and address any violations included in this Warning Letter. If you believe that your products are not in violation of the FD&C Act, include your reasoning and any supporting information for our consideration as part of your response.\nYour firm’s response should be sent via email to Gina Brackett, Establishment Assessment Team 1 (EAT-1) Assistant Director at CDRHEnforcement@fda.hhs.gov. Please include in the subject line, “CMS Case # 712573” when replying. If you have any questions about the contents of this letter, please contact: Sargum C. Morgan, Compliance Officer at sargum.morgan@fda.hhs.gov.\nFinally, you should know that this letter is not intended to be an all-inclusive list of the violations at your firm’s facility. It is your firm’s responsibility to ensure compliance with applicable laws and regulations administered by FDA. The specific violations noted in this letter and in the Inspectional Observations, FDA 483, issued at the close of the inspection may be symptomatic of serious problems in your firm’s manufacturing and quality management systems. Your firm should investigate and determine the causes of any violations and take prompt actions to address any violations and bring the products into compliance.\nSincerely,\n\u002FS\u002F\nMatthew G. Hillebrenner\nDeputy Director\nOffice of Product Evaluation and Quality\nCenter for Devices and Radiological Health\nCC: Len Tokish\nVP of Quality Assurance & Regulatory Affairs\nltokish@onkossurgical.com","Onkos Surgical, Inc.","onkos-surgical-inc-712573-07212025","2026-08-18T06:42:28.676509+00:00","https:\u002F\u002Fwww.fda.gov\u002Finspections-compliance-enforcement-and-criminal-investigations\u002Fwarning-letters\u002Fonkos-surgical-inc-712573-07212025","2026-10-26T08:09:38.140644+00:00","2025-07-29","712573","Medical Devices","Patrick J. Treacy","2026-08-19T16:32:45.913+00:00","VIA Electronic Mail","2025-07-21",2,{"510k":56,"classification":57,"enforcement":58,"event":59,"event_backfill":60,"pma":61,"warning_letter":62},"2026-11-16T02:00:55.89+00:00","2026-11-16T02:00:41.999+00:00","2026-11-16T02:00:49.415+00:00","2026-11-17T04:00:34.414+00:00","2026-09-07T05:17:28.839+00:00","2026-11-16T02:01:03.155+00:00","2026-11-17T01:02:55.859+00:00"]